Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.10822520

- Product Categories
- Machining
- Rail drilling machine
- Tamping machine
- Railway accessories
- Hydraulic lifting machine
- Mine switch
- Railway tool
- Friendly Links
Information Name: | Imports NZG-31-type internal combustion rail drilling machine |
Published: | 2013-11-06 |
Validity: | 300 |
Specifications: | NZG-31 type |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Very happy to recommend NZG-31-type internal combustion rail drilling machine, NZG-31-type internal combustion rail drilling machine is the company's flagship products, if you have any needs or suggestions, please contact us at Tel: 18853736667 Xu Jingli, we will be happy to serve you! NZG-31-type internal combustion rail drilling machine complete specifications, NZG-31-type internal combustion rail drilling machine performance is stable, NZG-31-type internal combustion rail drilling machine good quality excellent price, we sincerely welcome you to order internal combustion rail drilling machine ! I. Scope NZG-31-type internal combustion rail drilling machine for 43 kg / m ~ 75 kg / m rail track various type drilling operations. Overall structure is compact, is the quality of light of a drilling machine. Rail clamp device has a self-locking function, positioning accuracy, high precision drilling. The hollow drill bit may also be needed clamping φ13.5 less twist drill, drilling with automatic water supply function, is the public works department maintenance, repair and overhaul operations tool. Second, the main technical parameters of an internal combustion engine model: Honda gasoline GX35 2, engine power: 1.2kW 3, load speed: ≥ 270r/min 4, hole diameter: Φ31, Φ13.5, Φ9.8 5, drilling time : ≤ 40s 6, Total weight (including pull to): 17kg 7, Dimension: 650 × 230 × 250 Third, the basic structure and working principle works: the internal combustion engine through the clutch gear transfers power to the spindle, spindle driven rotary drill bit to carry out drilling campaign; simultaneously pulled to move the feed through the rack so that the spindle feed movement, to achieve the purpose of drilling. Its basic structure as shown: a gasoline engine, two gearboxes, three water nozzles, four ruler locator, five positioning feet six fixtures pull handle, 7 adjusting nut, eight specific folder, nine pull the feed, 10 positioning block 11 Note buckets, 12 valve, 13 pipes four, use and maintenance of a. Job preparation: 1, drill mounting: the scene working to install φ31 hollow drill or φ13.5, φ9.8 twist drill. Specific methods are as follows: (1) In this manual, installation φ31 hollow drill, for example, will pull the feed direction ⑨ gasoline pushed to the final end. (2) then pull the fixture ⑥ direction to lift the gasoline engine. (3) Lift the drilling machine with a wrench or finger release spindle sleeve two set screws, the drill bit into the inner core, and then two were aligned with the flat at the two set screws, insert the flower key shaft and splined shaft with roots close together, and then tighten the set screw will complete the installation of the equipment shipped to φ31 hollow drill bit, see attached: (4) Drill REMOVAL: according to the above (1), (2) step lift drilling machines, rotating bolt with wrench counterclockwise, remove the drill bit from the spindle sleeve. (5) After the operation, you must use a random band wrench (wrench caused by other equipment, such as damage to the consequences) Remove the drill bit and the screw holes coated with thin oil or rust inhibitor. 2, the positioning block installation: Model selection and they give the same rail positioning block ⑩ (This positioning block for the combination of dual positioning block, namely 43 and 50, 60 and 75 combined, were playing with words 43,50,60,75 , numbers close to the side rails, which represents the track type to be drilled. positioning block on the side of the bolt counterclockwise with a wrench loosen the bolts to 60Kg / m, for example, the 60 words near the rail on one side, positioning groove abutting fixture files with clockwise tighten the bolts. shown below: 3. Note the use of bucket: Align the handle slot Note bucket mouth downward pressure to the roots, to suppress the device handle counterclockwise rotation spin out, filling the coolant water barrel (to prevent drill and drilled holes rusted rail), fill the coolant after tighten clockwise, then counter-clockwise a small angle, from the mouth of the slot injection bucket to take out, back and forth a few to start with the pressure (to inject pressurized bucket), insert the hose clamps at the drill pipe 3, the outlet valve handle grip Note buckets, thumbs down the pressure valve after being pushed forward is open at this time, downward pressure on the drill core to determine the coolant flowing out from the drill before you can proceed. 4, positioning ruler Introduction and Installation: The positioning ruler divided into 43,50,60,75 etc. models, respectively, to play at the positioning ruler Guaitou marked every foot of the positioning detents were three standard pitch are processed by rail would be pulled backwards locator ruler, ruler ⑤ Insert the positioning jig body Next to the first slot. 5, add fuel and lubricants: refueling: first unscrew the fuel cap, and after adding 90 # unleaded gasoline or ethanol fuel, and then tighten the fuel tank cap, filling lubrication Oil: first unscrew the lubrication chamber fuel tank cap, 20 # gasoline and oil filling summer, winter, -20 # gasoline filling oil, reached its ruler tick marks can be, essential plus or overfill gas oil, tighten the fuel tank cap. Press your finger gasoline carburetor storage bubble a few times, until the carburetor storage vesicles filled with petrol can. shown: 6, start gasoline engine: the temperature is below 10 ℃, it is usually the first damper closed (up mention), increase the throttle to 1/4, quickly pull the boot disk, and slowly back until the gasoline engine starts, slowly open the throttle to maximum (downward pressure), and slowly increase the throttle, idling 30 second, check the transmission part is flexible, with or without abnormal noise, screw connection is loose, push gasoline engine stop button, ready to drill. two, drilling operations: 1, pull the lifting fixture ⑥, the rail agency open, on the rail, so that the inside of the positioning block Guaitou abutting rail face, adjust the rail adjusting nut ⑦, pull up under the pressure of the clamp securely when clamping rails, the positioning block rail head profile in close contact with the rail, while rail palate and rail arc also will try to be on the bottom, and then pull the jig under the pressure ⑥, you can install the card firmly after drilling operations. 2, give a cheer pressurized injection bucket 11 (usually 10 or so under), The valve 12 is depressed to push the open state, then start gasoline engine, the working parts are no exception in the case, of the nine pull pulled evenly feed feeding rail contacts the core drill, the cooling liquid automatic Drill out on cooling, if there is no coolant flow, check the water tube, to be troubleshooting before drilling. 3, drilling afterburner should be uniform, not too much, about to drill, to slow down the feed speed three, after drilling operations: 1. first solo drill holes completed, pull the feed direction of the 9 to gasoline pulled the drill return, close the gasoline engine. 2 will be positioned after the ruler transferred to the second tank Repeat steps to be drilled after, and then transferred to a third tank positioning ruler, repeat the same steps 1 to 3 drilling operations, namely the completion of drilling operations. 3, the inlet mouth pressed down, pull out water pipes, put downward pressure injection cylinder valve, pull back the valve ⑿, release the valve to stop water, and then lift the card ⑥ Loosen tight pull the rail authority will be drilling machine, water gauge tube moves outside. or the whole lower road. took note buckets, four, maintenance and repair: 1. After drilling should be wiped clean and maintain machinery for cleaning, if long-term need to be exhausted fuel, placed in ventilated, dry, non-corrosive gases coffers. 2. always check whether it drops out at the spindle, if drops out, to be replaced at its spindle seals 3. bit worn, can no longer be drilled, replace the drill bit. 4, filling petrol, the engine should be shut down and away from the fire source, after refueling equipment to wipe the surface residual gasoline is recommended to use 90 # or higher octane unleaded gasoline. 5, adjust or repair equipment replacement parts, should be shut down for 6, do not let the rain machines, such as the rain, the ministries should gasoline engine and equipment dry, placed in a ventilated, dry place. 7, 30 days of continuous work drilling machine gear box would like to add Note molybdenum disulfide grease to keep the equipment in good working condition. feeding rack to keep clean, wipe its surface, week 20 # oil can. 8, gasoline engine oil regularly check the adequacy of oil, air filters is clean. 9, the drilling machine as long without, you must remove the drill from the spindle sleeve 10, gasoline recommended operating ambient temperature between -15 ℃ ~ 40 ℃ 11. their equipment can not be modified . |
Admin>>>
You are the 13136 visitor
Copyright © GuangDong ICP No. 10089450, Mining Machinery Co., Ltd. Jinan Ninghao Bo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13136 visitor
Copyright © GuangDong ICP No. 10089450, Mining Machinery Co., Ltd. Jinan Ninghao Bo All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility